Work orders that close as reliability records

Plan, execute and close every job through eight states, so what you finish is data you can trust

One work order, one maintenance record

A work order in Magnus Reactor is the job and the record at once. It carries the tag and installed unit, the maintenance category and activity, scheduled and actual dates, active hours and downtime, the crew who did the work and the parts they used. One work order is one maintenance record, laid out the way ISO 14224 Table 8 expects, so nothing is re-keyed later for reliability analysis.

The lifecycle does the enforcing. A job moves from requested to closed through eight states, and the step from work done to completed checks that the times, hours and codes a reliability engineer needs are actually there. The front of the process asks for little so that the back of it can be strict.

Explore asset management

Benefits

  • Raise work without waiting for codes

    Report a failure with the tag, what happened in plain words, how bad it is and when. Mechanism, cause and detection method are filled in later by whoever knows, never by the person holding the radio.

  • Move every job through the same eight states

    Requested, approved, planned, scheduled, in progress, work done, completed, closed. Each transition stamps who moved it and when, so a job's history is a sequence of facts rather than a memory.

  • Close only jobs that are fully recorded

    Completion checks actual start and finish, active hours and downtime, the activity and item for corrective work, and the failure event link. A work order that passes is a maintenance record you can compute from.

  • Keep the preventive program on schedule

    Define PM tasks by calendar, operating hours or demands, fixed or floating, with grace days and route-based targets. Work orders are raised ahead of due dates and anything past due lands in the backlog.

Plan, gate and classify every job

Take a job from request to closure

A work order starts as a request and ends as a closed record. Review it into approved, with technical-authority approval when the job is safety critical and overdue. Identify activities, resources and parts to make it planned; assign dates and crew to make it scheduled. Stamping the actual start puts it in progress, the craft confirms work done, validated times and resources make it completed, and technical completion closes it. Cancel from any of the first four states. Every move lands in the status history with who, when and a note.

Follow the lifecycle step by step

Follow a job through the lifecycle

Eight states from request to closure. A job can be canceled from any of the first four; once work starts, it can only move forward, and each step forward has something to satisfy.

  1. Requested

    A job is raised against a tag: a failure reported from the field, a PM task falling due, or a modification request. Cancel here if it is a duplicate.

    Tag and plain-words description

  2. Approved

    Review the request. Safety-critical work that is already overdue needs technical-authority approval before it goes any further.

    Technical authority when safety critical and overdue

  3. Planned

    Identify the maintenance activity, the subunit or item, the labor disciplines, resources and parts the job needs, and estimate hours and cost.

    Activities, resources and parts identified

  4. Scheduled

    Set scheduled start and finish within the latest allowable finish, and assign the crew. This is the last state from which a job can be canceled.

    Dates and crew assigned

  5. In progress

    Stamping the actual start moves the job. From here the work order can only go forward.

    Actual start stamped

  6. Work done

    The craft confirms the work is physically finished and the time is stamped. Hours, delays and parts can still be recorded.

    Craft confirmation

  7. Completed

    Times, hours, downtime, activity, item, delay reason and the failure-event link are validated. A corrective job completing here moves its failure event to corrected.

    All completion gates pass

  8. Closed

    Technical completion. The closure time is stamped and the work order becomes a maintenance record that reliability KPIs read from.

    Closure time stamped

Questions we are asked

  • No. Moving from work done to completed requires actual start and finish, active maintenance hours and downtime hours, and an answer to whether the work was done while the equipment was running. If downtime far exceeds active time, a delay reason is required too. The job stays at work done until those facts are entered.

  • No. The field entry is the tag, plain words, how bad and when; the codes come afterwards, from lists filtered to the equipment class. A mode outside the class matrix is recorded with a warning, not rejected.

  • One action on the PM work order reports the failure: a failure event is created with the detection method derived from the PM subcategory, and a linked corrective work order is raised at the same time. An organization setting decides whether minor faults fixed in place during the PM must raise a record or can be noted on the PM itself.

  • Only after its corrective work order completes. Completing the linked work order moves the event to corrected on its own; closing it is a separate step that verifies the coding and must be done by a second person, never the reporter. The rule is enforced per record, whatever role the reporter holds.

  • Because it is not maintenance. Rebuilding, upgrading or re-engineering equipment consumes hours and parts and deserves a work order, but counting it as corrective or preventive would distort failure rates, PM/CM ratios and man-hour KPIs. Modification work orders keep every field of the record and are excluded from every maintenance KPI.

  • Yes. Corrective work is classified immediate or deferred, with priority high, medium or low, and plant impact zero, partial or total. An immediate job can be raised, approved and started in minutes and still carries the same completion gates, so an emergency repair ends up as complete a record as a scheduled one.

Take the next step

Walk through Magnus Reactor with someone who has run maintenance operations — on your own asset data, at your pace.